Start with Bellevue’s two sample drawings

On the City of Bellevue Documents & Forms page, look under Sample Diagrams for the deck drawing and footing example. The first gives you a way to discuss the overall deck. The second brings the conversation down to the footing, the base that transfers the load from a support into the ground.

Ask your builder to prepare a drawing specific to your property and explain what the city needs for your scope. The building permits office can confirm jurisdiction for the project address and direct you to the application.

Decide what changes at the house and in the yard

For a new deck, mark the back door and the place you want to step onto the lawn. For a rebuild, sketch the current footprint first, then draw the proposed edge and stair landing over it. A change in either spot gives the builder a reason to revisit the location of supports.

  • Show the existing landing or stairs and where the new ones would end.
  • Mark basement windows, walkways or planted areas you want to keep accessible.
  • Ask who will prepare the project drawings and arrange any required inspections.

Give each builder the same Bellevue project

Send the same sketch to each builder. Ask for a separate description of demolition, footings, rails, stairs and permit work. If the proposals differ, trace the difference to a line on the drawing before comparing their totals.